Tuesday, June 8, 2010

20/5/10

Site visit to Bedong,Sungai Petani.
-New bridge was built but still under construction
-Need to remove old cable to a new joint
-There are two type of joint:crossbond and straight through
-Straight through is referring to the sketching oage
-Crossbond joint installation is almost same as straight through joint

No comments:

Post a Comment