Site visit to Bedong,Sungai Petani.
-New bridge was built but still under construction
-Need to remove old cable to a new joint
-There are two type of joint:crossbond and straight through
-Straight through is referring to the sketching oage
-Crossbond joint installation is almost same as straight through joint
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment