Monday, May 3, 2010

3/5/2010

Site Visit to Pencawang Protab Agrobase Packaging,Changlun

Vacuum Test Equipment(Green ~Acceptable,Red~defective);Voltage set at 25kv




Electrical Machinery



LV Distribution Board (pengagihan Bekalan)


It also used to trace leakage of electricity,therefore tranduce analog to digital then send to SCADA





Remote Terminal Unit PE Telekom Jitra






Our main objective for today~~to trace out flash over.Needed to confirm whether circuit breakers in the good condition





setting up Vacuum Test









Circuit breakers (After flash over)






Maintenance of circuit breakers









Tracing out each line










Tracing the fault










Drawing out Schematic Diagram(to bring back Pencawang as reference)